Planning a 1,500 kVA transformer replacement

An industrial owner needed options for a failed 13.2 kV to 480Y/277 V dry-type transformer in a second-floor electrical room. Electron developed two options: remove and rebuild the existing unit, or install a new transformer sized for the existing bay. The proposal addressed rigging access, the connection to the existing switchgear, temporary-power cutover, and the sequence for testing and returning the equipment to service.
Second-floor removal & cutover plan
The proposal maps the removal route from the second-floor electrical room through the exterior opening, including crane and rigging requirements. It also sequences temporary power, the shutdown and cutover, switchgear connections, testing, and return to service.
Proposed role and coordination
Electron’s proposed role is prime electrical contractor, coordinating the owner, riggers, transformer specialists, and testing personnel around the facility’s operating requirements.
Project Photo Details


Customer-neutral project summary. Client names, internal identifiers, pricing, and facility addresses are intentionally omitted.