Planning a 1,500 kVA transformer replacement

Existing dry-type transformer documented for a replacement proposal in Philadelphia
Existing dry-type transformer documented for the replacement proposal

An industrial owner needed options for a failed 13.2 kV to 480Y/277 V dry-type transformer in a second-floor electrical room. Electron developed two options: remove and rebuild the existing unit, or install a new transformer sized for the existing bay. The proposal addressed rigging access, the connection to the existing switchgear, temporary-power cutover, and the sequence for testing and returning the equipment to service.

Second-floor removal & cutover plan

The proposal maps the removal route from the second-floor electrical room through the exterior opening, including crane and rigging requirements. It also sequences temporary power, the shutdown and cutover, switchgear connections, testing, and return to service.

Proposed role and coordination

Electron’s proposed role is prime electrical contractor, coordinating the owner, riggers, transformer specialists, and testing personnel around the facility’s operating requirements.

Project Photo Details

Existing distribution equipment reviewed while planning the transformer connection
Existing distribution lineup reviewed for the transformer connection
Exterior access considered for removal and return of the transformer assembly
Exterior rigging access considered for removal and return

Customer-neutral project summary. Client names, internal identifiers, pricing, and facility addresses are intentionally omitted.